URL details: mymediaflip.com/publication/?i=583630&p=15&pp=1&view=issueViewer#{%22page%22:14,%22issue_id%22:583630,%22numpages%22:%221%22}

URL title: DTE Energy Spring 2019 Page 15
URL paragraphs: After the contractor visit, a DTE representative stopped by and told Douglas the project would qualify for nancial incentives, which could help cover the initial cost. That clinched the deal, and Douglas went full-throttle with the project. LED lighting in
URL last crawled: 2023-01-10
URL speed: 0.105 MB/s, downloaded in 0.100 seconds

open external url

1 external links to this url

Only links from external domains are shown on this page.

found date
link text
from url
2023-01-10
DTE Engergy Smarts