URL details: www.interpreter-h2020.eu/demonstration-sites/cuerva/
URL title:
CUERVA - Interpreter
URL paragraphs:
A portion of the grid located in Láchar and operated by Grupo Cuerva will be the main Spanish demonstration site. This portion of the grid consists of 1 secondary substation 20 kV / 400 V with 11 low voltage feeders and 270 supply points, with several pro
URL last crawled:
2022-12-23
URL speed:
0.132 MB/s,
downloaded in 0.400 seconds
We found no external links pointing to this url.