URL details: www.waagnerbiro-bridgesystems.com/references/floating-bridge-dubai

URL title: Floating Bridge Dubai — Waagner Biro Bridge Systems
URL description: The 365m long Floating Bridge Dubai carries six lanes over the Dubai Creek. At its centre is a movable bridge section to provide an unobstructed shipping lane. The entire construction was completed in a record time of just 23 days.
URL last crawled: 2023-01-08
URL speed: 0.326 MB/s, downloaded in 0.200 seconds

open external url

We found no external links pointing to this url.