URL details: www.agostiniconstruction.com/our-portfolio/k-12
URL title:
Our K-12 Projects — Agostini Construction
URL paragraphs:
The new Braintree South Middle School will be a new 145,580 sf, steel frame construction, two-story multi-wing building that will house up to 800 students in grades 5-8. The existing Windmill facility will be renovated for grade appropriate swing space to
URL last crawled:
2023-01-04
URL speed:
0.419 MB/s,
downloaded in 0.400 seconds
We found no external links pointing to this url.